The Nuclear Small Modular Reactors (SMR) Market has moved from a long-promised idea to a market with signed contracts, regulatory approvals and construction under way. Three forces are behind the change. Electricity demand is rising again after decades of little growth, driven by AI data centres, the electrification of industry and transport, and manufacturing returning home. Governments increasingly see steady, low-carbon power as a matter of energy security, and more than 30 countries now support tripling global nuclear capacity by 2050. Large, financially strong buyers, including Google, Amazon, Meta, Microsoft and Dow, are signing long-term power and development agreements. This gives developers the anchor customers that earlier SMR programmes never had.
SMRs offer what these buyers want: steady, round-the-clock power in units small enough to finance, site and build again and again. Factory production, modular construction and standard designs promise shorter build times and lower costs with each unit built. Their small footprint and passive safety features open up sites that large reactors cannot use. These include retiring coal plants, industrial parks, data-centre campuses and remote communities.
2026 has been the most important year in the industry’s history. In the United States, the Nuclear Regulatory Commission issued construction permits for TerraPower’s Natrium plant in March, TVA’s Clinch River BWRX-300 in September and Dow and X-energy’s Long Mott Generating Station in November. It is also putting the ADVANCE Act into effect and finalising the risk-informed Part 53 rules. Kairos Power began building its 50 MWe Hermes 2 reactor for Google in April. In Europe, Rolls-Royce SMR signed for three units at Wylfa, was selected for three units at Värö in Sweden, and grew its Czech programme to up to 3 GW. In February, South Korea passed a Special Act on SMR development with support from all parties, setting up a five-year master plan and dedicated research zones. In China, CNNC’s 125 MWe Linglong One on Hainan is entering commercial operation. It is the first commercial land-based light-water SMR, and joins the HTR-PM high-temperature reactor at Shidaowan.
The year also showed the risks. In November, Ontario Power Generation said Darlington Unit 1, the first BWRX-300 in the Western world, will miss its October 2030 start date and its original budget. It blamed first-of-a-kind engineering and the knock-on effects on construction and suppliers. The main limits on how fast the market can grow are still supply of HALEU fuel, the depth of the forging and component supply chain, skilled labour, and financing for the first projects.
Global installed SMR capacity is about 6.8 GW at the end of 2026. Almost all of it is in China and Russia, plus a few demonstration units. In the central case, capacity reaches about 19 GW by 2030, 67 GW by 2035, 179 GW by 2040 and 378 GW by 2047. Light-water designs remain the core of the market, at about half of 2047 capacity. High-temperature gas, liquid-metal fast and molten salt reactors gain ground as fuel supply and licensing mature. North America becomes the largest regional market, ahead of Europe and China. Grid electricity remains the main use, while data centres and AI and industrial process heat grow fastest. Hydrogen, district heating and ship propulsion become real niche markets in the 2030s.
The range of outcomes is wide. If SMRs keep being built one project at a time, 2047 capacity could be as low as 90 GW. True factory production, combined with demand in line with net-zero targets, would push it past 700 GW. The deciding question is whether the first fleets can show cost and schedule falling from one unit to the next. Those fleets are Clinch River, Darlington, Wylfa, Long Mott and the US projects backed by big tech companies. Over the next three years the market will move from permits and announcements to construction, and the companies that can build the same design repeatedly will shape the industry to 2047.

cover
- Published: November 2026
- Pages: 364
- Tables: 191
- Figures: 54
SMRs are becoming one of the most important parts of the energy transition. Factory-built reactors of up to about 300 MWe per unit, plus microreactors below 20 MWe, promise steady, low-carbon power and heat for:
- power grids
- data centres
- heavy industry
- hydrogen production
- remote sites
In 2026, permits, construction starts, fleet contracts and power purchase deals with big tech companies turned SMRs from a pipeline of designs into a market with real projects. Delays to first-of-a-kind units also showed how much depends on execution.
The Global Nuclear Small Modular Reactors (SMR) Market 2027–2047 gives a full, independent assessment of the technologies, markets, policies and companies shaping the industry. It forecasts installed capacity from 2027 to 2047, with 2026 as the base year, broken down by reactor type, region and application. It also includes construction revenue forecasts and a supply-and-demand scenario framework, with 2047 outcomes ranging from 90 GW to more than 700 GW. The report covers project economics, capital costs, levelised cost of electricity (LCOE), financing models and how costs change under different construction approaches. It also reviews the challenges to deployment: licensing, HALEU fuel supply, the supply chain, workforce and public acceptance.
Report contents include:
- An executive summary covering market drivers, 2026 developments and the central-case forecast to 2047 (378 GW).
- SMR definitions and technologies: light-water, high-temperature gas, liquid-metal fast, molten salt and microreactors, and how they compare.
- The global policy and regulatory landscape: US NRC permits, the ADVANCE Act and Part 53; Canada, the UK and the EU; Korea’s Special Act on SMRs; China and Russia.
- Applications: grid power, data centres and AI, industrial heat, coal-plant replacement, district heating, hydrogen, marine, remote and defence uses.
- A database of major projects, first-of-a-kind status and dedicated data-centre SMR projects.
- Economics: cost breakdowns, LCOE against other power sources, cost of capital, financing models and cost learning curves.
- Fuel and the supply chain: HALEU, TRISO fuel, enrichment, forgings and module manufacturing.
- Challenges for SMR deployment: regulation, fuel, supply chain, workforce, waste, public acceptance and lessons from Darlington.
- Market forecasts for 2027–2047 by reactor type, region and application, plus construction revenue, investment and scenario analysis.
- Profiles of 61 companies, each with a key-facts box, why the company matters, the Future Markets view, recent developments and its competitive position including Aalo Atomics, ARC Clean Technology, ASP Isotopes, Blue Capsule, Blue Energy, Blykalla (formerly Leadcold), BWX Technologies (BWXT), Centrica, Centrus Energy, China National Nuclear Corporation (CNNC), Copenhagen Atomics, Deep Fission, Doosan Enerbility, Dual Fluid Energy, EDF (Électricité de France), FANCO (First American Nuclear Corporation), Fermi Energia, GE Hitachi Nuclear Energy (GEH), General Atomics (GA), HD Hyundai, Helen Oy, Hexana, Holtec International, IHI Corporation, JAEA (Japan Atomic Energy Agency), Jimmy Energy, Kairos Power, Kärnfull Next, Korea Atomic Energy Research Institute (KAERI), Korea Hydro and Nuclear Power (KHNP), Last Energy, Lightbridge Corporation, Naarea, NANO Nuclear Energy, Natura Resources, Newcleo and more......
Purchasers will receive the following:
- PDF report download/by email.
- Comprehensive Excel spreadsheet of all data.
- Mid-year Update
Payment methods: Visa, Mastercard, American Express, Paypal, Bank Transfer. To order by Bank Transfer (Invoice) select this option from the payment methods menu after adding to cart, or use the Request a quote/Pay by invoice button or contact info@futuremarketsinc.com
1. Executive Summary 18
- 1.1 Market Overview 19
- 1.1.1 The "Golden Age of Nuclear": 2025–2026 policy inflection point 19
- 1.1.2 AI, data centers and Big Tech as SMR demand anchors 19
- 1.1.3 The 700 GW industrial opportunity — $0.5–1.5 trillion thesis 20
- 1.2 Market Forecast 20
- 1.3 Technological Trends 21
- 1.4 Regulatory Landscape 23
- 1.5 Key 2025–2026 Market Catalysts (UK NWF / US NSTM-3 / EU PINC) 24
- 1.6 Four Supply × Four Demand Scenarios — Market-Access Matrix 24
- 1.7 Critical Market Drivers 25
- 1.8 Key SMR Market Developments in 2026 26
2. Introduction 28
- 2.1 Scope of This Report 28
- 2.2 Fundamentals of Nuclear Power 29
- 2.2.1 How Nuclear Fission Generates Power 29
- 2.2.1.1 Nuclear fission 30
- 2.2.1.2 Controlling nuclear chain reactions 30
- 2.2.2 Core Reactor Systems and Components 30
- 2.2.2.1 Fuels 31
- 2.2.2.2 Safety parameters 31
- 2.2.2.2.1 Void coefficient of reactivity 31
- 2.2.2.2.2 Temperature coefficient 31
- 2.2.2.3 Light Water Reactors (LWRs) 32
- 2.2.2.4 Ultimate heat sinks (UHS) 32
- 2.2.2.5 Key Components and Systems 32
- 2.2.3 Reactor Generations: From Gen I to Gen IV 33
- 2.2.3.1 Established nuclear technologies 34
- 2.2.3.2 Nuclear as a source of low-carbon power 35
- 2.2.1 How Nuclear Fission Generates Power 29
- 2.3 The Shift Towards Smaller Reactors 36
- 2.3.1 Cost, Schedule and Siting Challenges of Large Reactors 36
- 2.3.1.1 The nuclear industry 36
- 2.3.1.2 Challenges for nuclear power 37
- 2.3.1.3 Construction and costs of commercial nuclear power plants 37
- 2.3.2 Why the Industry Is Moving to Small Modular Designs 39
- 2.3.2.1 Renewed interest in nuclear energy 39
- 2.3.1 Cost, Schedule and Siting Challenges of Large Reactors 36
3. Small Modular Reactors: Definitions and Technologies 40
- 3.1 Defining the SMR 40
- 3.1.1 Size, Modularity and Classification 40
- 3.1.1.1 SMR Category Boundary 41
- 3.1.2 Benefits and Drawbacks of SMRs 42
- 3.1.3 SMRs Compared with Gigawatt-Scale Reactors 43
- 3.1.1 Size, Modularity and Classification 40
- 3.2 SMR Technology Families 44
- 3.2.1 Light-Water SMRs 49
- 3.2.1.1 Pressurized Water Reactors (PWRs) 50
- 3.2.1.1.1 Overview 50
- 3.2.1.1.2 Key features 53
- 3.2.1.1.3 Examples 54
- 3.2.1.2 Pressurized Heavy Water Reactors (PHWRs) 57
- 3.2.1.2.1 Overview 57
- 3.2.1.2.2 Key features 63
- 3.2.1.2.3 Examples 65
- 3.2.1.3 Boiling Water Reactors (BWRs) 65
- 3.2.1.3.1 Overview 65
- 3.2.1.3.2 Key features 67
- 3.2.1.3.3 Examples 68
- 3.2.1.1 Pressurized Water Reactors (PWRs) 50
- 3.2.2 High-Temperature Gas-Cooled Reactors (HTGRs) 70
- 3.2.2.1 Pebble Bed Reactors 70
- 3.2.2.1.1 Overview 70
- 3.2.2.1.2 Key features 71
- 3.2.2.2 Overview 71
- 3.2.2.3 Elevated operating temperatures 72
- 3.2.2.4 Key features 75
- 3.2.2.5 Examples 76
- 3.2.2.1 Pebble Bed Reactors 70
- 3.2.3 Molten Salt and Fluoride-Salt-Cooled Reactors 78
- 3.2.3.1 Overview 78
- 3.2.3.2 Key features 79
- 3.2.3.3 Examples 80
- 3.2.4 Liquid-Metal and Gas-Cooled Fast Reactors 81
- 3.2.4.1 Liquid Metal Cooled Reactors 81
- 3.2.4.1.1 Overview 81
- 3.2.4.1.2 Key features 83
- 3.2.4.1.3 Examples 84
- 3.2.4.2 Overview 85
- 3.2.4.3 Key features 86
- 3.2.4.4 Examples 86
- 3.2.4.1 Liquid Metal Cooled Reactors 81
- 3.2.5 Emerging and Hybrid Reactor Concepts 87
- 3.2.5.1 Supercritical Water-Cooled Reactors (SCWRs) 87
- 3.2.5.1.1 Overview 87
- 3.2.5.1.2 Key features 87
- 3.2.5.2 Emerging Technologies and Future Developments 88
- 3.2.5.1 Supercritical Water-Cooled Reactors (SCWRs) 87
- 3.2.6 Microreactors 89
- 3.2.6.1 Heat Pipe Reactors 89
- 3.2.6.1.1 Overview 89
- 3.2.6.1.2 Key features 90
- 3.2.6.1.3 Examples 90
- 3.2.6.2 Overview 90
- 3.2.6.3 Key features 91
- 3.2.6.4 Examples 91
- 3.2.6.1 Heat Pipe Reactors 89
- 3.2.1 Light-Water SMRs 49
- 3.3 The Value Proposition of SMRs 92
- 3.3.1 SMR benefits 92
- 3.3.2 Carbon Emissions Analysis — Lifecycle g CO₂e/kWh 93
- 3.3.3 Carbon Emissions Reduction Potential (2027–2047) 94
- 3.3.4 Land Use Comparison — SMR vs. Traditional Nuclear vs. Renewables 95
- 3.3.5 Water Usage Comparison 95
- 3.4 Structural Constraints on SMR Deployment 96
- 3.4.1 Nuclear Waste Management — Volumes, Categories, and Disposal Pathways 97
- 3.4.2 Spent Fuel Handling by Reactor Type 97
- 3.4.3 Environmental Impact of Specific Reactor Types 98
- 3.4.4 Public Health and Safety 98
- 3.4.5 Social Acceptance and Community Engagement 99
4. Government Policy, Projects and Technology Developments 100
- 4.1 National SMR Strategies 100
- 4.1.1 United States 101
- 4.1.1.1 Trump Administration 400 GW Nuclear-by-2050 Target 101
- 4.1.1.2 NSTM-3 — National Security Technology Memorandum on Space Nuclear (April 14, 2026) 101
- 4.1.1.3 DOE $800m TVA/Holtec SMR-300 Award (December 2025) 102
- 4.1.1.4 DOE $2.7bn HALEU Procurement 102
- 4.1.1.5 ADVANCE Act and Executive Orders on NRC reform 102
- 4.1.1.6 State-level SMR Policy Landscape 102
- 4.1.2 Canada 102
- 4.1.3 Europe 103
- 4.1.3.1 UK — Great British Nuclear and the "Golden Age of Nuclear" 103
- 4.1.3.2 European Union — PINC (€241bn to 2050) and European Industrial Alliance on SMRs 103
- 4.1.3.3 Sweden — SEK 220bn New-Nuclear Framework 104
- 4.1.3.4 Finland — Helen Oy SMR subsidiary; LUT test facilities; Steady Energy LDR-50 104
- 4.1.3.5 Norway — Trondheimsleia Kjernekraft / Norsk Kjernekraft 104
- 4.1.3.6 Other European National Policies 104
- 4.1.4 Russia 105
- 4.1.5 China 106
- 4.1.6 Japan 106
- 4.1.7 Korea 106
- 4.1.8 India — Indigenous iPHWR, Thorium Partnerships 107
- 4.1.9 Middle East, Africa and Latin America Policies 107
- 4.1.10 World Bank June 2025 Nuclear Lending Reversal 108
- 4.1.11 International Cooperation and Harmonization 108
- 4.1.12 Export Control and Non-Proliferation 108
- 4.1.1 United States 101
- 4.2 SMR Project Pipeline 109
- 4.2.1 Construction and Licensing Milestones 109
- 4.2.1.1 Major SMR Projects Tracker — Global (Q2 2026 snapshot) 110
- 4.2.2 Leading Projects by Country 112
- 4.2.2.1 Current SMR reactor designs and projects 112
- 4.2.1 Construction and Licensing Milestones 109
- 4.3 Technology Development Trends 114
- 4.3.1 Design Goals for Next-Generation SMRs 114
- 4.3.1.1 Design Principles of SMRs 114
- 4.3.2 Passive and Inherent Safety 114
- 4.3.3 Factory Fabrication and Modular Construction 115
- 4.3.3.1 Advanced Manufacturing Techniques 116
- 4.3.3.2 Modularization and Factory Fabrication 116
- 4.3.3.3 Delivery-Model Evolution — bespoke → standardised → shipyard → mass manufacturing 117
- 4.3.3.3.1 Onsite EPC (current, ~$125/MWh, 10+ years) 118
- 4.3.3.3.2 Standardised onsite EPC ($90–125/MWh, 5–7 years) 118
- 4.3.3.3.3 Shipyard manufacturing ($60–90/MWh, 2–3 years) — Prodigy, Blue Energy 118
- 4.3.3.3.4 Mass manufacturing ($40–70/MWh) — DfMA, Aalo, Copenhagen Atomics, Project Pele 118
- 4.3.3.4 Transportation and Site Assembly 119
- 4.3.4 Multi-Product Energy Supply 119
- 4.3.5 Integration with Storage and Renewables 119
- 4.3.1 Design Goals for Next-Generation SMRs 114
- 4.4 Regulatory Frameworks and Licensing 119
- 4.4.1 International Atomic Energy Agency (IAEA) Guidelines 119
- 4.4.2 Nuclear Regulatory Commission (NRC) Approach to SMRs 120
- 4.4.3 European Nuclear Safety Regulators Group (ENSREG) Perspective 120
- 4.4.4 Regulatory Challenges and Harmonization Efforts 120
- 4.4.5 Licensing Processes for SMRs 121
- 4.4.6 Environmental Impact Assessment 121
- 4.4.7 Public Acceptance and Stakeholder Engagement 121
- 4.4.8 Product-Based Licensing and Type Certification for SMRs 122
- 4.4.9 NRC 10 CFR Part 53 — risk-informed, performance-based framework 122
- 4.4.10 ADVANCE Act and Executive Order on NRC reform 122
- 4.4.11 Pre-Application Engagement Case Studies 122
- 4.4.11.1 First American Nuclear (FANCO) EAGL-1 — April 2026 filing 123
- 4.4.11.2 Newcleo LFR pre-application (February 2026) 123
- 4.4.11.3 TerraPower Natrium — first US advanced-reactor construction permit in a decade 123
- 4.4.12 International Regulatory Harmonization Initiatives 123
- 4.4.12.1 IAEA Nuclear Harmonization and Standardization Initiative (NHSI) 123
- 4.4.12.2 OECD-NEA Multinational Design Evaluation Programme (MDEP) 124
- 4.4.12.3 UK–US–Canada Trilateral Regulatory Cooperation 124
- 4.4.12.4 Atlantic Partnership for Advanced Nuclear Energy (Sept 2025) 124
- 4.4.12.5 EDF NUWARD™ joint regulatory review 124
5. Market Dynamics and Industry Ecosystem 125
- 5.1 State of the Global SMR Industry 125
- 5.1.1 Projections for nuclear installation rates 125
- 5.1.2 Development Status 125
- 5.1.3 SWOT Analysis 126
- 5.1.4 Job Creation in SMR Industry 127
- 5.2 Market Drivers 129
- 5.2.1 Net-Zero Commitments and Carbon Pricing 129
- 5.2.1.1 Decarbonization 129
- 5.2.1.2 Decarbonization pressure — CBAM, ETS, Scope-3 130
- 5.2.2 Electricity Demand from Data Centres and Industry 130
- 5.2.2.1 Projected Energy Demand 130
- 5.2.3 Coal Plant Retirements and Repowering 131
- 5.2.4 Grid Reliability and System Strength 131
- 5.2.4.1 Energy security and price volatility 131
- 5.2.4.2 Reliability deterioration — April 2025 Spain–Portugal blackout 131
- 5.2.5 Global Energy Mix Projections (2027–2047) 132
- 5.2.1 Net-Zero Commitments and Carbon Pricing 129
- 5.3 Market Restraints 132
- 5.3.1 Technology Readiness 133
- 5.3.1.1 Design Certification and Licensing 133
- 5.3.1.2 Fuel Development and Supply 133
- 5.3.1.3 Component Manufacturing and Quality Assurance 134
- 5.3.1.4 Grid Integration and Load Following 134
- 5.3.2 Cost and Financing 134
- 5.3.2.1 Capital Costs and Financing 134
- 5.3.2.2 Economies of Scale 135
- 5.3.2.3 Market Competition from Other Energy Sources 135
- 5.3.3 Regulation, Policy and Institutions 135
- 5.3.3.1 Social and Political Challenges 136
- 5.3.3.1.1 Public Perception and Acceptance 136
- 5.3.3.1.2 Nuclear Proliferation Concerns 137
- 5.3.3.1.3 Waste Management and Long-Term Storage 137
- 5.3.3.2 Harmonization of International Standards 137
- 5.3.3.3 Site Licensing and Environmental Approvals 137
- 5.3.3.4 Liability and Insurance Issues 137
- 5.3.3.1 Social and Political Challenges 136
- 5.3.4 Supply Chain and Industrial Capacity 137
- 5.3.5 Market Challenges for SMRs 138
- 5.3.6 Geopolitical Risks 139
- 5.3.7 Risk Management Framework 139
- 5.3.1 Technology Readiness 133
- 5.4 The SMR Supply Chain 140
- 5.4.1 Structure of the Nuclear Value Chain 140
- 5.4.1.1 Value Chain Analysis 140
- 5.4.2 Distinctive Features of SMR Supply Chains 141
- 5.4.2.1 In-house vs. outsourced manufacturing strategies 141
- 5.4.3 Supply Chain Readiness 142
- 5.4.3.1 Forgings, pressure vessels, steam generators (BWXT, Doosan, HD Hyundai, IHI) 143
- 5.4.3.2 Specialty materials — SGL Carbon graphite, lithium-7, molten salt 145
- 5.4.4 Fuel Supply: LEU, HALEU and Advanced Fuels 145
- 5.4.4.1 HALEU / TRISO fuel supply chain 145
- 5.4.4.2 Uranium Mining Capacity as Structural Supply Constraint 146
- 5.4.5 Bottlenecks and Mitigation 147
- 5.4.1 Structure of the Nuclear Value Chain 140
- 5.5 Investment, Partnerships and Government Support 147
- 5.5.1 Capital Flows into SMR Developers 147
- 5.5.1.1 SMR Private Investment 147
- 5.5.1.2 SMR Listed-Equity Snapshot 148
- 5.5.1.2.1 Pure-play SMR developers 149
- 5.5.1.2.2 Fuel-cycle infrastructure 149
- 5.5.1.2.3 Nuclear-manufacturing conglomerates with SMR exposure 149
- 5.5.1.2.4 Utility and offtaker exposure 149
- 5.5.2 Major Investments and Partnerships, 2026 150
- 5.5.2.1 Big Tech and Hyperscaler SMR Capital Commitments 150
- 5.5.2.2 M&A and Consolidation 151
- 5.5.2.2.1 Rescue acquisitions and distressed asset transfers 152
- 5.5.2.2.2 Strategic consolidation and brand rationalization 152
- 5.5.2.2.3 Vertical integration by fuel-cycle consolidation 152
- 5.5.2.2.4 SPAC listings and public-market capital 153
- 5.5.2.2.5 Strategic equity partnerships and minority investments 153
- 5.5.3 National SMR Legislation and Special Acts 153
- 5.5.1 Capital Flows into SMR Developers 147
- 5.6 Competitive Landscape 154
- 5.6.1 Competitive Strategies 154
- 5.6.2 New Product Developments and Innovations 155
- 5.6.3 Industrial-User Buyer Consortia 156
- 5.6.3.1 IANC — Industrial Advanced Nuclear Consortium (Chevron, ConocoPhillips, ExxonMobil, Freeport-McMoRan, Nucor, Rio Tinto, Shell) 156
- 5.6.3.2 Texas A&M RELLIS — Kairos, Terrestrial, Aalo, Natura (Feb 2025) 157
- 5.6.3.3 NATO microreactor programme (Last Energy advisory) 157
6. SMR Economics and Business Models 158
- 6.1 Cost Competitiveness Against Alternative Firm Power 158
- 6.1.1 Large Nuclear, SMRs and Firmed Renewables Compared 158
- 6.1.1.1 Nuclear energy costs 159
- 6.1.2 Complementarity with Renewables 160
- 6.1.2.1 Interaction with variable renewables 160
- 6.1.3 The Value of Flexible Operation 160
- 6.1.1 Large Nuclear, SMRs and Firmed Renewables Compared 158
- 6.2 Cost Drivers 160
- 6.2.1 Sensitivity of SMR Costs to Key Variables 160
- 6.2.1.1 Project Economics Comparison: Leading LWR SMR Designs 162
- 6.2.1 Sensitivity of SMR Costs to Key Variables 160
- 6.3 From First-of-a-Kind to Nth-of-a-Kind 163
- 6.3.1 FOAK and NOAK Cost Profiles 163
- 6.3.1.1 Execution Risks — FOAK-to-NOAK Transition 165
- 6.3.2 Learning Rates and Series Production 165
- 6.3.2.1 Learning Curves in Nuclear Construction: US vs. China" 167
- 6.3.1 FOAK and NOAK Cost Profiles 163
- 6.4 Pricing, Contracting and Business Models 168
- 6.4.1 Financing Models and Investment Strategies 168
- 6.5 Revenue Streams Beyond Power Sales 170
- 6.5.1 Non-Electric Revenue Opportunities 170
- 6.5.2 Process Heat and District Heating Revenues 170
- 6.5.3 Hydrogen and Desalination Revenues 170
7. Markets and Applications 172
- 7.1 Application Landscape 172
- 7.1.1 Application Requirements 172
- 7.1.1.1 Industrial Application Requirements and SMR Capability Matching 172
- 7.1.1.2 Markets and Applications for SMRs 173
- 7.1.2 Space Applications — Lunar Reactor-1, Space Reactor-1 "Freedom", In-Space Propulsion 174
- 7.1.3 Defence Applications 175
- 7.1.1 Application Requirements 172
- 7.2 Maritime Applications 176
- 7.2.1 Nuclear Propulsion for Merchant Shipping 176
- 7.2.2 Regulation and Industry Developments 176
- 7.2.2.1 Marine SMRs — Propulsion, Offshore Platforms, Floating Plants 177
- 7.2.3 National Nuclear Shipping Programmes 177
- 7.2.4 Barriers to Commercial Nuclear Shipping 178
- 7.2.4.1 Maritime Nuclear Regulatory Framework 178
- 7.2.4.1.1 IAEA ATLAS initiative (2024) 178
- 7.2.4.1.2 IMO MSC 110 revision of 1981 Code for Nuclear Merchant Ships 178
- 7.2.4.1.3 Nuclear Energy Maritime Organization (NEMO) 178
- 7.2.4.1 Maritime Nuclear Regulatory Framework 178
- 7.3 Power Generation 179
- 7.3.1 Coal-to-Nuclear Conversion 179
- 7.3.1.1 Coal-fired power plant conversion 179
- 7.3.1.2 Coal repowering 180
- 7.3.2 Distributed Power and Grid Support 180
- 7.3.2.1 Electricity Generation — Baseload, Flexibility, Cogeneration 181
- 7.3.2.2 Remote and Off-Grid Power — Mining, Arctic, Islands, Military 181
- 7.3.1 Coal-to-Nuclear Conversion 179
- 7.4 AI Data Centres 182
- 7.4.1 AI-Driven Electricity Demand 182
- 7.4.1.1 US Data Center Power Gap 182
- 7.4.2 SMRs as a Data-Centre Power Solution 183
- 7.4.2.1 Data Center / AI Direct Power 183
- 7.4.2.2 Hyperscaler offtake deals (Amazon/X-energy, Google/Kairos, Equinix/Oklo) 183
- 7.4.2.3 Dedicated-SMR data-center campuses (Dow Seadrift, Cottam, Cascade) 183
- 7.4.2.4 Willingness-to-pay benchmarks — Google/Fervo $107/MWh, Equinix $130/MWh 184
- 7.4.1 AI-Driven Electricity Demand 182
- 7.5 Industrial Energy Applications 184
- 7.5.1 Industrial Process Heat and District Heating 184
- 7.5.1.1 Nuclear District Heating 184
- 7.5.1.2 Strategic co-location of SMRs with industrial facilities 185
- 7.5.1.3 High-temperature reactors for industrial heat 185
- 7.5.2 Hydrogen Production and Desalination 185
- 7.5.2.1 Hydrogen and Industrial Gas Production 185
- 7.5.2.2 Desalination 186
- 7.5.2.2.1 Technology pathways 187
- 7.5.2.2.2 Principal regional markets 187
- 7.5.2.2.3 Commercial developments and reactor matching 187
- 7.5.2.2.4 Economics 187
- 7.5.3 Synthetic Fuels — SAF, Green Methanol, Green Ammonia 187
- 7.5.4 Three-tier industry categorization: Catalyst / High-Confidence / High-Impact 188
- 7.5.5 The 11 key industrial sectors: technical requirements profile 189
- 7.5.5.1 Data centers 190
- 7.5.5.2 Upstream oil & gas 190
- 7.5.5.3 Military applications 191
- 7.5.5.4 Chemicals 192
- 7.5.5.5 District energy 192
- 7.5.5.6 Refining oil & gas 193
- 7.5.5.7 Food & beverage 193
- 7.5.5.8 Synthetic aviation fuels 194
- 7.5.5.9 Synthetic maritime fuels 194
- 7.5.5.10 Iron & steel — EAF, DRI, H2-DRI pathways 195
- 7.5.1 Industrial Process Heat and District Heating 184
- 7.6 Matching Technologies to Applications 195
- 7.6.1 SMR technical-capability matching (heat temperature × sector) 196
- 7.7 Application Deployment Pathways 198
8. Challenges for SMR Deployment 199
- 8.1 Technology and Engineering Challenges 199
- 8.1.1 Technology Development Priorities 199
- 8.1.2 Design Maturity, Approvals and Demonstration Plants 199
- 8.1.3 Equipment and Supply Chain Development 200
- 8.1.4 Modular Construction and Delivery Innovation 200
- 8.2 Policy and Regulatory Challenges 200
- 8.2.1 SMR Institutional Frameworks in 2026 201
- 8.2.2 Regulatory Capacity and Technology-Inclusive Rules 201
- 8.2.3 Licensing Reform 201
- 8.2.4 Siting Rules and Emergency Planning 202
- 8.2.5 SMRs in Power System Planning 202
- 8.3 Financing and Market Design 202
- 8.3.1 Funding First-of-a-Kind Projects 202
- 8.3.2 Cost Recovery and Revenue Frameworks 203
- 8.4 Public Acceptance 203
- 8.5 Industrial Strategy 203
- 8.5.1 Building Integrated Nuclear Ecosystems 203
- 8.5.2 Export Competitiveness 203
9. Hybrid Energy Systems: SMRs with Storage and Renewables 205
- 9.1 Why Pair SMRs with Energy Storage 205
- 9.2 Hybrid System Configurations 205
- 9.2.1 Configuration Options 206
- 9.2.1.1 Integrated Energy Centers — Electricity + Heat + H₂ + Desalination 206
- 9.2.2 SMRs with Battery Storage 206
- 9.2.3 SMRs with Thermal Energy Storage 207
- 9.2.4 SMR, Renewables and Storage Hybrids 207
- 9.2.4.1 "Bridge Power" gas-to-nuclear transition architectures 207
- 9.2.1 Configuration Options 206
- 9.3 Benefits of Storage Integration 207
- 9.3.1 Grid Flexibility 207
- 9.3.2 Plant Utilisation and Efficiency 207
- 9.3.3 Reliability and Resilience 208
- 9.4 Economics of SMR–Storage Hybrids 208
- 9.4.1 Cost and Revenue of Storage Integration 208
- 9.4.2 Second-Life Batteries 208
- 9.5 Projects, Research and Demonstrations 208
- 9.5.1 Commercial and Licensed Projects 208
- 9.5.2 Research Programmes and Test Platforms 209
- 9.5.3 Integration and Safety Interfaces 209
- 9.6 Deployment Pathways 209
- 9.6.1 Priority Markets for Hybrid Systems 209
- 9.6.2 Phased Demonstration and Commercialisation 209
10. Market Forecasts and Strategic Outlook 211
- 10.1 Global SMR Market Forecasts 211
- 10.1.1 Deployment to 2030 211
- 10.1.1.1 Deployment Timelines and Milestones 212
- 10.1.2 Scenario Forecasts to 2050 213
- 10.1.2.1 Market Access Framework — Technical → Addressable → Accessible 213
- 10.1.2.2 Four Supply Scenarios: Current (7 GW) / Programmatic (120 GW) / Breakout (347 GW) / Transformation (700 GW) 214
- 10.1.2.3 Four Demand Scenarios: Energy Cost / Energy Security / APS / NZE 215
- 10.1.2.4 Accessible-market heatmaps — North America (up to 424 GW) and Europe (up to 277 GW), 2035 & 2050 216
- 10.1.2.5 Delivery Model Innovation Scenario 217
- 10.1.2.6 Regulatory Modernization Scenario 217
- 10.1.2.7 Economic Viability Scenario 218
- 10.1.2.8 Site Availability Scenario 218
- 10.1.2.9 Capital Access Scenario 218
- 10.1.2.10 Developer Ecosystem Scenario 218
- 10.1.2.11 Combined Scenario — Integrated Supply and Demand Pathways 219
- 10.1.2.12 Long-Term Market Projections Beyond 2047 219
- 10.1.2.13 Global Energy Mix Scenarios with SMR Integration 219
- 10.1.2.13.1 Central-case projection (Breakout supply × APS demand) 220
- 10.1.2.13.2 NZE scenario (Transformation supply × NZE demand) 220
- 10.1.2.13.3 Energy Cost scenario (Programmatic supply × Energy Cost demand) 220
- 10.1.2.13.4 Regional deployment concentration 220
- 10.1.3 Annual Capacity Additions 220
- 10.1.4 Forecasts by Region 221
- 10.1.4.1 Regional Market Analysis 223
- 10.1.4.1.1 North America 223
- 10.1.4.1.2 Europe 224
- 10.1.4.1.3 Asia-Pacific 227
- 10.1.4.1.4 Middle East and Africa 228
- 10.1.4.1.5 Latin America 228
- 10.1.4.2 Regional Market Share Evolution (2026 → 2047) 228
- 10.1.4.1 Regional Market Analysis 223
- 10.1.5 Forecasts by Reactor Type 229
- 10.1.5.1 Technology-by-Technology Trajectory to 2047 230
- 10.1.1 Deployment to 2030 211
- 10.2 Demand Drivers in the Forecast 231
- 10.3 Forecasts by Application 232
- 10.3.1 SMR Applications and Market Share 233
- 10.3.2 SMR Technical Potential: ~15,000 TWh ≈ 2,200 GW upper bound 233
- 10.3.3 Market Penetration Analysis 234
- 10.4 SMR-Integrated Energy Storage Market 234
- 10.5 Priority Markets 235
- 10.5.1 Market Assessment Criteria 235
- 10.5.2 Market Entry Requirements 236
- 10.5.3 Phased Market Entry Strategy 237
- 10.6 Market Development Phases 237
- 10.7 Conclusions and Strategic Implications 238
- 10.7.1 Strategic Implications for Vendors, Customers, and Investors 238
- 10.7.2 Potential Disruptive Technologies 238
- 10.7.3 Fusion Energy as Potential Long-Term Competitor 239
11. Company Profiles 240 (61 company profiles)
12. Appendices 375
- 12.1 Research Methodology 375
- 12.1.1 Methodology Framework 375
- 12.1.2 Definitions 375
- 12.1.3 Data Sources 376
- 12.1.4 Limitations 376
- 12.2 Nine-Criteria Design Evaluation Matrix 377
- 12.2.1 Application of the Framework — Summary Matrix 377
- 12.3 Study Summaries — Key Peer-Reviewed and Institutional Studies Referenced 379
- 12.4 Maritime Pathway Comparison 380
- 12.5 Glossary 381
- 12.6 Acronyms and Abbreviations 383
13. References 388
List of Tables
- Table 1. Motivation for Adopting SMRs 18
- Table 2. SMR Market Growth Trajectory, 2027–2047 20
- Table 3. Major 2025–2026 SMR policy and funding catalysts 21
- Table 4. Technological trends in Nuclear Small Modular Reactors (SMR) 22
- Table 5. Regulatory landscape for Nuclear Small Modular Reactors 23
- Table 6. Four Supply × Four Demand Scenario Matrix — summary 24
- Table 7. Critical Market Drivers — overview and KPIs 25
- Table 8. Key SMR market developments, March–November 2026 26
- Table 9. Report scope and structure 28
- Table 10. Key physical principles of nuclear power generation 29
- Table 11. Principal reactor components and SMR design approaches 30
- Table 12. Safety Physics Indicators by Reactor Family 31
- Table 13. Ultimate Heat Sink Requirements by Reactor Type 32
- Table 14. Key Components and Systems 33
- Table 15. Established nuclear technologies 34
- Table 16. Structural limitations of large nuclear power plants 36
- Table 17. Generations of nuclear technologies 37
- Table 18. SMR Construction Economics 38
- Table 19. Cost of Capital for SMRs vs. Traditional NPP Projects 38
- Table 20. The Upper Boundary of "Small Modular Reactors" — Design Comparison 42
- Table 21. Advantages and Disadvantages of SMRs 42
- Table 22. Comparison with Traditional Nuclear Reactors 43
- Table 23. SMR Technology Benchmarking 45
- Table 24. Comparison of SMR Types: LWRs, HTGRs, FNRs, and MSRs 47
- Table 25. Quantitative Benchmark — 10 SMR Technologies (scored 1–5) 48
- Table 26. Types of PWR 51
- Table 27. Key Features of Pressurized Water Reactors (PWRs) 53
- Table 28. Comparison of Leading Gen III/III+ Designs 58
- Table 29. Gen-IV Reactor Designs 61
- Table 30. Key Features of Pressurized Heavy Water Reactors 63
- Table 31. Key Features of Boiling Water Reactors (BWRs) 67
- Table 32. HTGRs- Rankine vs. Brayton vs. Combined Cycle Generation 72
- Table 33. Key Features of High-Temperature Gas-Cooled Reactors (HTGRs) 75
- Table 34. Comparing LMFRs to Other Gen IV Types 82
- Table 35. Emerging Technologies and Future Developments in SMRs 89
- Table 36. Core value propositions of SMRs 92
- Table 37. SMR Benefits 92
- Table 38. Comparison of Carbon Emissions — SMRs vs. Other Energy Sources 93
- Table 39. Carbon Emissions Reduction Potential of SMRs, 2027–2047 94
- Table 40. Regional Avoided Emissions at 2047 (Base Case Scenario) 94
- Table 41. Sectoral Avoided Emissions at 2047 (Base Case Scenario) 94
- Table 42. Land Use Comparison — SMRs vs. Traditional Nuclear vs. Renewables 95
- Table 43. Water Usage Comparison — SMRs vs. Traditional Nuclear 96
- Table 44. Structural constraints on SMR deployment 96
- Table 45. SMR Waste Volumes, Categories, and Disposal Pathways 97
- Table 46. Spent Fuel Handling by Reactor Type 97
- Table 47. Environmental Profile by Reactor Type 98
- Table 48. Public Acceptance — 2025 Polling Across Key Markets 99
- Table 49. National SMR policy frameworks, Q4 2026 100
- Table 50. NSTM-3 — Three Parallel Space-Nuclear Programmes 101
- Table 51. US Federal SMR-Related Funding Commitments (2023–2026) 102
- Table 52. UK Nuclear Programme Funding and Milestones (2024–2026) 103
- Table 53. EU PINC €241bn Investment Roadmap — Allocation Summary 104
- Table 54. European National Policy Summary (Q2 2026) 105
- Table 55. Russian SMR programme, Q4 2026 106
- Table 56. International SMR Cooperation Frameworks (Q2 2026) 108
- Table 57. SMR construction and licensing milestones, 2023–2026 109
- Table 58. Major SMR Projects and Their Status, Q2 2026 110
- Table 59. SMR Projects (2026 update) 112
- Table 60. Key Safety Features of SMRs 115
- Table 61. Advanced Manufacturing Techniques 116
- Table 62. SMR Cost Evolution by Delivery Model 117
- Table 63. Regulatory Challenges and Harmonization Efforts 120
- Table 64. SMR Licensing Process Timeline 121
- Table 65. Active NRC Pre-Application Engagements (2025–2026) 122
- Table 66. UK–US Atlantic Partnership for Advanced Nuclear Energy: Key Provisions 124
- Table 67. Global SMR industry indicators, Q4 2026 125
- Table 68. Development Status 126
- Table 69. Job Creation in SMR Industry by Sector, 2047 (Central Case) 127
- Table 70. Forces Driving Industrial Nuclear Adoption 129
- Table 71. Projected Energy Demand (2027–2047) 130
- Table 72. April 2025 Spain–Portugal Blackout — Impacts and Lessons 132
- Table 73. Global Energy Mix Projections, 2027–2047 132
- Table 74. Technical Challenges in SMR Development and Deployment 133
- Table 75. Economic Challenges for SMR Implementation 134
- Table 76. Regulatory Challenges for SMR Adoption (Update 2026) 135
- Table 77. Social and Political Challenges for SMR Implementation 136
- Table 78. Supply Chain Risk Assessment 137
- Table 79. Market Challenges for SMRs 138
- Table 80. SMR Risk Allocation Framework by Counterparty 139
- Table 81. Nuclear industry supply chain ecosystem and leading SMR participants 140
- Table 82. In-house vs. Outsourced Manufacturing — SMR Developer Strategies 141
- Table 83. Long-Lead Component Suppliers and Capacity 143
- Table 84. RPV Supply Capacity vs. Scenario Demand 144
- Table 85. Fuel requirements by SMR technology 145
- Table 86. HALEU Supply — DOE Awards, Producers, Offtake (2024–2026) 145
- Table 87. Global Uranium Mining Capacity Outlook 146
- Table 88. Supply chain bottlenecks and solutions 147
- Table 89. SMR Private Investment (by investor category, 2020–2026) 147
- Table 90. Listed SMR-Related Equities (Q2 2026) 148
- Table 91. Selected SMR investments, partnerships and policy support, 2026 150
- Table 92. Big Tech / Hyperscaler SMR Capital Commitments (2024–2026) 150
- Table 93. Notable SMR M&A and Corporate Events (2024–2026) 151
- Table 94. Dedicated SMR and advanced nuclear legislation, 2024–2026 153
- Table 95. Key provisions of Korea's SMR Special Act 154
- Table 96. Competitive Strategies in SMR 154
- Table 97. New Product Developments and Innovations 155
- Table 98. IANC Founding Members — Industry and Strategic Rationale 156
- Table 99. Comparison of large nuclear plants, SMRs and renewables with ESS 158
- Table 100. Comparative Costs of SMRs with Other Types 159
- Table 101. Key variables in SMR economics and their impact on LCOE 160
- Table 102. Cost Breakdown of SMR Construction and Operation 161
- Table 103. Project Economics Comparison — Leading LWR SMR Designs 162
- Table 104. Project Economics Comparison — Leading Advanced SMR Designs 162
- Table 105. FOAK versus NOAK SMR characteristics 163
- Table 106. FOAK SMR Projects — Status (Q2 2026) 164
- Table 107. FOAK Execution Risk Framework 165
- Table 108. FOAK vs. NOAK SMR Projections — Key Parameters 166
- Table 109. US vs China Nuclear Construction Cost Learning — Historical and Projected 167
- Table 110. SMR electricity pricing and business models 168
- Table 111. Financing Models for SMR Projects 168
- Table 112. Potential non-power revenue streams for SMRs 170
- Table 113. Key SMR applications and requirements 172
- Table 114. Industrial Sector Technical Requirements Analysis 173
- Table 115. Markets and Applications for SMRs 174
- Table 116. Space Nuclear Reactor Programmes (Q2 2026) 175
- Table 117. Nuclear-powered ship concepts: technology options 176
- Table 118. Marine SMR Applications 177
- Table 119. Nuclear-powered ship and floating SMR programmes by country, 2026 177
- Table 120. Maritime Nuclear Regulatory Initiatives (IAEA ATLAS, IMO MSC 110, NEMO) 179
- Table 121. Industrial Process Heat SMR Applications and Reactor Match 179
- Table 122. Electricity Generation SMR Applications 181
- Table 123. Remote / Off-Grid SMR Applications 181
- Table 124. US Data Center Power Supply-Demand Balance, 2024–2030 182
- Table 125. Hyperscaler SMR Offtake Agreements (2024–2026) 183
- Table 126. Data Center / AI Dedicated SMR Projects 183
- Table 127. Willingness-to-pay benchmarks for firm clean power 184
- Table 128. Nuclear District Heating — Key Projects and Technologies 185
- Table 129. Nuclear Hydrogen Production Pathways 186
- Table 130. Nuclear Desalination Applications 186
- Table 131. Synthetic Fuels Applications 188
- Table 132. Three-tier Industry Categorization 188
- Table 133. Key 11 Industrial Sectors — technical requirements summary 189
- Table 134. Technology suitability by application (●●● high, ●● medium, ● low) 196
- Table 135. Heat Demand Breakdown by Temperature Band for Key Industries 197
- Table 136. Recoverable Heat Temperature by Reactor Technology 198
- Table 137. SMR application deployment scenarios, 2027–2047 198
- Table 138. Global SMR technology development priorities by technology family 199
- Table 139. Status of standard design approvals and demonstration reactors, Q4 2026 200
- Table 140. SMR institutional frameworks in leading markets, 2026 201
- Table 141. Construction licensing durations for recent SMR and advanced reactor projects 201
- Table 142. Financial support instruments for first SMR projects 202
- Table 143. Public acceptance challenges and responses 203
- Table 144. Export-oriented SMR ecosystems: national strengths 204
- Table 145. Hybrid energy system configurations with SMRs 206
- Table 146. Integrated Energy Center Examples — Regional Deployment Archetypes 206
- Table 147. Indicative economics of SMR–storage integration 208
- Table 148. Commercial and licensing cases of SMR–storage integration 208
- Table 149. Deployment priorities for SMR hybrid systems by market type 209
- Table 150. Phased demonstration and commercialisation strategy for SMR hybrid systems 209
- Table 151. SMR Deployment Timeline and Phase Characteristics, 2027–2047 212
- Table 152. Project Supply Scenarios — Main Assumptions 215
- Table 153. Energy Demand Scenarios — Assumptions 215
- Table 154. Accessible Market Heatmap — North America, 2035 and 2050 216
- Table 155. Accessible Market Heatmap — Europe, 2035 and 2050 216
- Table 156. Top-Five SMR Accessible Markets by Region (Transformation + APS, 2050) 217
- Table 157. Delivery Model Scenario Bands (2047 GW Outcomes) 217
- Table 158. Developer Ecosystem Consolidation Scenarios (2030 Outcome) 219
- Table 159. Combined Supply × Demand 2047 Outcomes 219
- Table 160. Annual Global SMR Capacity Additions and Cumulative Capacity, 2027–2047 220
- Table 161. Regional Cumulative SMR Capacity, 2047 (Central / Breakout Scenario) 221
- Table 162. SMR Market Size by Region, 2027–2047 222
- Table 163. SMR Construction Revenue by Region 2027–2047 (US$ Billions, Breakout Central Case) 222
- Table 164. US DOE Awards for SMR Deployment (2024–2026) 223
- Table 165. US State-Level SMR Legislation (2025–2026) 224
- Table 166. UK Great British Nuclear / GBE-N Funding Commitments (2024–2026) 225
- Table 167. Rolls-Royce SMR Wylfa Project Economics and Milestones 225
- Table 168. European SMR Country-by-Country Programmes 226
- Table 169. Regional Market Share Evolution, 2027–2047 228
- Table 170. SMR Market Size by Reactor Type, 2027–2047 229
- Table 171. SMR Construction Revenue by Reactor Technology 2027–2047 (US$ Billions) 229
- Table 172. Technology Trajectory by Reactor Family, 2027–2047 (Central Case) 231
- Table 173. Key demand drivers of SMR market growth and their weight in the central case 231
- Table 174. Six Critical Market Drivers — Status and Inflection Events 231
- Table 175. SMR Market Size by Application, 2027–2047 232
- Table 176. SMR Applications and Their Market Share, 2027–2047 233
- Table 177. SMR Technical Potential by Industry and Region (2050) 233
- Table 178. SMR Market Penetration by Segment, 2047 234
- Table 179. Criteria for assessing priority SMR markets 235
- Table 180. Competitiveness and entry requirements by market 236
- Table 181. Priorities and phased market entry strategy 237
- Table 182. Key Decision Points and Inflection Events, 2026–2035 237
- Table 183. Fusion vs SMR Commercial Timeline Comparison 239
- Table 184. NuScale VOYGR — SWOT Analysis 321
- Table 185. Rolls-Royce SMR — SWOT Analysis 332
- Table 186. TerraPower Natrium — SWOT Analysis 352
- Table 187. X-energy Xe-100 — SWOT Analysis 367
- Table 188. Nine-Criteria SMR Design Evaluation Framework 377
- Table 189. Nine-Criteria Design Evaluation — Leading SMR Designs (Summary, Q2 2026) 377
- Table 190. Maritime Pathway Comparison — Floating Power Plants vs. Marine Propulsion vs. Offshore Platforms 380
- Table 191. Acronyms and Abbreviations 383
List of Figures
- Figure 1. Global SMR Market Growth Trajectory, 2027–2047 21
- Figure 2. Six Critical Drivers Activation Diagram — 7 GW to 700 GW 26
- Figure 3. Evolution of nuclear energy systems by generation 34
- Figure 4. Indicative comparison of large nuclear plants, LWR SMRs and microreactors 39
- Figure 5. Schematic of Small Modular Reactor (Integral PWR) operation 41
- Figure 6. Core outlet temperature range by SMR technology family and industrial heat thresholds 44
- Figure 7. SMR Coolant Temperature Hierarchy and Applications 45
- Figure 8. Pressurized Water Reactors 51
- Figure 9. CAREM reactor 56
- Figure 10. Westinghouse Nuclear AP300™ Small Modular Reactor 57
- Figure 11. Advanced CANDU Reactor (ACR-300) schematic 65
- Figure 12. GE Hitachi's BWRX-300 70
- Figure 13. The nuclear island of HTR-PM Demo 77
- Figure 14. U-Battery schematic 78
- Figure 15. Terrestrial Energy's IMSR 80
- Figure 16. Moltex Energy's SSR 81
- Figure 17. GE Hitachi PRISM 84
- Figure 18. Leadcold SEALER 85
- Figure 19. TerraPower's Natrium 86
- Figure 20. Russian BREST-OD-300 87
- Figure 21. SCWR schematic 88
- Figure 22. Westinghouse's eVinci 92
- Figure 23. Korea nuclear capacity under the 11th Basic Plan for Electricity Supply and Demand 107
- Figure 24. Status of SMR projects by country, Q4 2026 (number of projects) 110
- Figure 25. SMR Cost Curves Under Four Delivery-Model Generations 118
- Figure 26. SWOT Analysis of the SMR Market 127
- Figure 27. Total Industrial Energy Demand in Selected Industries, North America, 2025–2050 131
- Figure 28. Nuclear SMR Value Chain 141
- Figure 29. SMR Supply Chain Map — Critical Long-Lead Components and Suppliers 143
- Figure 30. Levelised cost of electricity ranges: large nuclear, SMRs and renewables with storage 158
- Figure 31. FOAK-to-NOAK cost trajectory under alternative learning rates 166
- Figure 32. Three-Tier Industry Categorization Diagram 189
- Figure 33. Heat Demand Breakdown by Temperature Band — SMR Technology Matching 197
- Figure 34. Illustrative daily dispatch of an SMR with integrated thermal storage 205
- Figure 35. Global SMR deployment outlook by scenario, 2027–2047 (cumulative GW) 213
- Figure 36. From SMR Technical Potential to Accessible Market 214
- Figure 37. Accessible SMR Market Waterfall — 7 → 700 GW under Four Supply Scenarios 215
- Figure 38. SMR deployment outlook by region, 2030 and 2047 (cumulative GW) 221
- Figure 39. SMR deployment outlook by reactor type, 2027–2047 (cumulative GW) 229
- Figure 40. SMR market development by application, 2030 and 2047 (GW) 232
- Figure 41. Potential market for SMR-integrated energy storage, cumulative investment (US$ billion) 235
- Figure 42. Strategic priority market matrix: attractiveness versus accessibility (bubble size = potential 2047 GW) 236
- Figure 43. ARC-100 sodium-cooled fast reactor 243
- Figure 44. Rendering of a Blykalla small modular reactor nuclear power plant 250
- Figure 45. Design concept of BWXT Advanced Nuclear Reactor 253
- Figure 46. ACP100 SMR 258
- Figure 47. Deep Fission pressurised water reactor schematic 263
- Figure 48. NUWARD SMR design 269
- Figure 49. Design concept of Holtec SMR-160 nuclear power plant 285
- Figure 50. Design concept of Kairos Power fluoride salt-cooled high-temperature reactor 293
- Figure 51. A rendering image of NuScale Power's SMR plant 320
- Figure 52. Oklo Aurora Powerhouse reactor 323
- Figure 53. Design concept of TerraPower molten chloride fast reactor technology 351
- Figure 54. Design concept of Westinghouse eVinci microreactor 364
Purchasers will receive the following:
- PDF report download/by email.
- Comprehensive Excel spreadsheet of all data.
- Mid-year Update
Payment methods: Visa, Mastercard, American Express, Paypal, Bank Transfer. To order by Bank Transfer (Invoice) select this option from the payment methods menu after adding to cart, or use the Request a quote/Pay by invoice button or contact info@futuremarketsinc.com